Why catalog updates took weeks
A catalog is not current merely because the latest product information exists in a system. The data still has to reach the right assortment, language, table, page and final PDF.
At Hakron, a small text correction may affect one item. A new product, changed article structure or replacement range can touch several catalog variants. Lead times became unpredictable across product information, catalog selection, layout preparation and review.
Hakron already used publishing tools. The opportunity was not a platform reset, but a better connection between approved product information, recurring catalog logic and specialist review.
Connect the repeatable core first. Use every production cycle to turn the next recurring correction into a reusable rule.
How Hakron changed the workflow
Hakron is improving the catalog process in stages. Each stage removes avoidable handling while preserving the systems and specialist review that already add value.
Maintain approved product information
Hakron manages the catalog input in SyncForce. Only concrete, approved information moves into the publishing process.
Pass updates into the publishing workflow
Approved product information is passed through Virto into the connected publishing process, normally by the following day.
Apply the document logic
2imagine uses InDesign-based templates and publishing rules to compose recurring content in the correct catalog structure.
Review the generated catalog
Product experts, marketing and DTP can review and adjust the online output where human input still adds value. Marketing manages covers, introduction pages and campaign content in 2imagine Brand Portal, while recurring catalog content generated from approved product data remains controlled.
Turn recurring corrections into reusable rules
Recurring interventions in non-product pages, unusual tables and production details become candidates for better data rules, template logic or controlled automation.
Customer quote
“We are now able to create our catalog in an automated way. Creating and updating no longer takes months. Important for us is the fact we can stay in our e-commerce platform Virto to manage our product information, with a live preview of how it will be published in the catalog.”
Gert-Jan Renes
Senior Marketeer | TAP Groep
Results so far
Beyond faster publishing, the integrated solution has delivered measurable gains. Innovadis reports the following results for the combined Hakron implementation with SyncForce, Virto and 2imagine:
Production cost
30% lower
Reported across the integrated catalog solution.
Time to market
25% faster
Reported for the connected production workflow.
Efficiency
50% higher
Reported for the combined implementation.
Hakron's operating experience adds another practical result: once product information is concrete and approved, changes that previously often took weeks can generally be processed within a few days. The publication route is shorter, while approval and specialist review remain part of a controlled process.
What the workflow delivers today — and what comes next
The connected workflow already shortens update cycles, supports multiple catalog variants and keeps generated output available for online review. The next optimization phase is to translate more recurring interventions into reusable rules.
What the workflow delivers today
- Approved product information moves through the connected publishing workflow.
- Recurring content enters an InDesign-based catalog structure.
- Multiple catalog variants use the same connected publishing environment.
- Generated output remains available for online review and adjustment.
Next priorities for workflow optimization
- Identify repeated corrections in non-product and editorial pages.
- Standardize unusual table or layout patterns where they are repeatable.
- Capture page-numbering and production rules in reusable logic.
- Reduce agency or DTP interventions that can be translated into controlled rules.
For suitable, repeatable production steps, 2imagine sets a minimum target of 80% less manual handling. At Hakron, this remains the objective for the next optimization phase, not a result already achieved across the complete catalog process. Specialist review remains where it adds value.